fbpx
Print this page

Slow Down for Construction Along Colonel By Drive

20 February 2017 | Published in News. Read 740 times.

slow down on CBDSlow Down: sound advice from Beacon Lite, who run the temporary signals on Colonel By Drive at the Bank Street exit and at the Avenue Road stairs.

The road has been narrowed and the multi-use pathway alongside the canal closed while the canal walls are being repaired, making travel on this stretch of roadway especially difficult.

Construction is expected to be completed by the start of the 2017 boating season.